After logging in with the login link in the top right, click here to upload your Capstone

Capstone Projects

PROPOSED DAY-USE SITE AT THE ADIRONDACK LAND TRUST GLENVIEW PRESERVE

Fri, 12/14/2018 - 15:43
Abstract: Glenview Preserve is a lowland mix deciduous forest that boarders the Bloomingdale Bog. The property would be a quintessential location for public engagement through a day-use site, which in turn would ensure future use and elevation of the Adirondack Land Trust and their mission objectives. Through the determined design goals and the predetermined ALT goals for the property a comprehensive blueprint has been presented. The proposed day-use site is predicted to increase the three essential services that communities in the Adirondacks thrive off of. Their economic value, health and environmental benefits, and their social importance streamlines with the ALT’s management practices and goals to provide a beneficial educational and recreational space for the community.
Access: Yes
Literary Rights: Off
Major: Parks and Conservation Management
Year: 2018
Authors: Nathan Smith

Creating a Reliable Surveying Network: Does Adding New Survey Control Points to Paul Smith’s College Campus Enhance its Current Network?

Tue, 12/05/2017 - 18:48
Abstract: The goal of the project was to improve the current geometry of the Paul Smith’s College surveying network. Four new survey control points were added to the current network allowing for new connectivity to old control points. Previously, there was a Westside network and an Eastside network that were not connected and by connecting these two networks, it has expanded the current network further into the campus. Two different methods were used to help identify the new network. A traditional survey method, a closed traverse, was used to connect the old control points to the new control points by utilizing a Nikon DTM-352 series total station. A X90 OPUS GPS unit was used to connect the new control points into a geodetic network. After the data was collected a least squares adjustment was done to the closed traverse to correct for error within the traverse. The GPS data was processed by Topcon Tools utilizing a Continuously Operating Reference System (CORS) to obtain a better level of accuracy for the network it produced. The two different techniques used produced different results in the overall survey networks and supplied different coordinates than what has been previously used by students at the college. These results gained from the project are not of a consistent level of precision and are not recommended for use without conducting more closed traverses to increase precision within the network.
Access: Yes
Literary Rights: Off
Major: Forestry, Natural Resources Management and Policy, Surveying Technology
Year: 2017
Authors: Frederick C. Petzoldt, Michael S. Thompson