Wetland X: Wetland Mitigation Plan Amendment

Mon, 12/03/2018 - 17:56
Abstract: Wetland X is a wetland that is located in Western New York and has been converted to agricultural land. The goal of this study was to create a restoration plan for Wetland X that meets Natural Resource Conservation Service (NRCS) standards. The study took place during June 2018 with the final plan being completed in August of 2018 and the data analysis report being completed in the fall of 2018. The focus of the study was on the woody vegetation of the site to document the species present and the density of vegetation on the site. Vegetation was sampled on four plots located at different areas of the site to provide the best representation of the sites overall conditions. The areas were sampled using zigzag transects and grid transect patterns; with one area being sampled using the zigzag pattern, two using the grid pattern and one using both transect methods as a comparison of the two methods. Sampling of the site found that an amendment was needed for Wetland X to ensure that the landowner remained in compliance with the Food Security Act Standards. The restoration plan focuses on planting and management techniques for the site that will allow proper growth of desired vegetation species and the eradication of the invasive species. The created restoration plan amendment has been implemented and will be completed by June of 2019 with five years of monitoring following completion.
Access: Yes
Literary Rights: Off
Major: Ecological Restoration
Year: 2018
File Attachments: Pratt_Capstone_2018.docx
Authors: Thomas Pratt

Paul Smith’s College Shoreline Restoration Conservation Plan

Fri, 12/14/2018 - 12:24
Abstract: A restoration plan was created for the Lower St Regis Lake shoreline of Paul Smith's College. To date, about 140 students have participated by way of studies and course work in surveys and assessments, which clearly indicate a much reduced level of biological diversity, ecosystem function, and human uses compared to other sites. The plan is designed based upon field assessments and with the intentions of using the shoreline as an on-site case study of experiential education – a tradition of at the core of Paul Smith’s College. The aim of the restoration plan is to increase biodiversity, ecosystem function, aesthetics, educational studies, and shoreline use.
Access: Yes
Literary Rights: Off
Major: Ecological Restoration
Year: 2018
Authors: Hunter Gaudette
, Joseph Hollner
, Jonathan Meadows
, Ryan Morr
, Sara Savoia, Cassandra Schrader

Creating a Reliable Surveying Network: Does Adding New Survey Control Points to Paul Smith’s College Campus Enhance its Current Network?

Tue, 12/05/2017 - 18:48
Abstract: The goal of the project was to improve the current geometry of the Paul Smith’s College surveying network. Four new survey control points were added to the current network allowing for new connectivity to old control points. Previously, there was a Westside network and an Eastside network that were not connected and by connecting these two networks, it has expanded the current network further into the campus. Two different methods were used to help identify the new network. A traditional survey method, a closed traverse, was used to connect the old control points to the new control points by utilizing a Nikon DTM-352 series total station. A X90 OPUS GPS unit was used to connect the new control points into a geodetic network. After the data was collected a least squares adjustment was done to the closed traverse to correct for error within the traverse. The GPS data was processed by Topcon Tools utilizing a Continuously Operating Reference System (CORS) to obtain a better level of accuracy for the network it produced. The two different techniques used produced different results in the overall survey networks and supplied different coordinates than what has been previously used by students at the college. These results gained from the project are not of a consistent level of precision and are not recommended for use without conducting more closed traverses to increase precision within the network.
Access: Yes
Literary Rights: Off
Major: Forestry, Natural Resources Management and Policy, Surveying Technology
Year: 2017
Authors: Frederick C. Petzoldt, Michael S. Thompson

Where in the Unite States Can Dual-Flush Toilets Flush Out Savings?

Mon, 12/02/2013 - 13:06
Abstract: Potable water is becoming increasingly scarce in water poor regions of the United States. Reducing the volume of potable water consumed residentially and commercially is vital to ensure a stable water dependent future. Converting a traditional single-flush toilet into a dual-flush toilet is arguably the most effective means for reducing wastewater production in both residential and commercial settings. The objective of this study was to determine where within the United States dual-flush retrofits are cost effective. A cost-benefit analysis illustrating the price of the dual-flush retrofits & the monetary value of the water conserved post installation will be created using Paul Smith’s College campus of northern New York State as a testing site. The study will utilize a total of 145 toilets for both commercial and residential settings. Costs of the installation and purchasing of the product will be used to determine pay-back period and thus, the economic benefit of installing dual-flush toilets. Secondary data from previously completed dual-flush studies determined where within the 50 states dual-flush retrofits are cost effective. The resulting data illustrated relatively long payback periods for the greater United States with the most dramatic differences being seen in Hawaii and the least in Nebraska.
Access: Yes
Literary Rights: On
Major: Natural Resources Sustainability
Year: 2013
File Attachments: FinalC.docx
Authors: Andrew Noviasky