After logging in with the login link in the top right, click here to upload your Capstone

Capstone Projects

Creating a Reliable Surveying Network: Does Adding New Survey Control Points to Paul Smith’s College Campus Enhance its Current Network?

Tue, 12/05/2017 - 18:48
Abstract: The goal of the project was to improve the current geometry of the Paul Smith’s College surveying network. Four new survey control points were added to the current network allowing for new connectivity to old control points. Previously, there was a Westside network and an Eastside network that were not connected and by connecting these two networks, it has expanded the current network further into the campus. Two different methods were used to help identify the new network. A traditional survey method, a closed traverse, was used to connect the old control points to the new control points by utilizing a Nikon DTM-352 series total station. A X90 OPUS GPS unit was used to connect the new control points into a geodetic network. After the data was collected a least squares adjustment was done to the closed traverse to correct for error within the traverse. The GPS data was processed by Topcon Tools utilizing a Continuously Operating Reference System (CORS) to obtain a better level of accuracy for the network it produced. The two different techniques used produced different results in the overall survey networks and supplied different coordinates than what has been previously used by students at the college. These results gained from the project are not of a consistent level of precision and are not recommended for use without conducting more closed traverses to increase precision within the network.
Access: Yes
Literary Rights: Off
Major: Forestry, Natural Resources Management and Policy, Surveying Technology
Year: 2017
Authors: Frederick C. Petzoldt, Michael S. Thompson

The Application of Silvicultural Treatments to Establish and Maintain Early Successional Habitat in the Adirondack Forests of New York State

Sat, 04/29/2017 - 15:12
Abstract: Early successional habitat (ESH) in New York state can be described as young forests comprising trees, shrubs, grasses, and other herbaceous plants that form relatively open canopies with dense understories. ESH has decreased due to nearly ninety percent of the naturally occurring shrublands of North America having been destroyed. The destruction of this habitat is of top concern due to the threatened and endangered species whom rely on these sorts of habitats to thrive. Considering the future climate projections, population models, and theoretical species distribution, responsible stewardship is needed to manage in favor of ESH types. A meta-analysis of various journals and databases was performed to synthesize information into a general management plan for establishing ESH in the Adirondacks. Through combining methods and silvicultural management practices from past plans in the northeastern United States, as well as background knowledge of the area, this management plan has been tailored specifically for an Adirondack forest. These outlined silvicultural treatments may also be extended to a variety of other forest types in the eastern U.S.A. Re-establishing young forests throughout the region is the goal of this plan. In doing so, these practices will enhance the health, resiliency, and biodiversity of the Adirondack region, and New York State by creating critical ESH which the fauna and flora of this region depend upon.
Access: Yes
Literary Rights: On
Major: Integrative Studies, Natural Resources Management and Policy
Year: 2017
Authors: Nicole Morin, Ryan Baker, Ora Bice

Site Management Plan for the VIC-Quarry Wall

Fri, 05/05/2017 - 13:38
Abstract: Over time, the Paul Smith's College VIC (VIC) has evolved into a more accessible and enjoyable nature center for the community and the Paul Smith's College students. The VIC offers free and fee based activities such as arts, sports, and educational programs throughout the year, including bird and nature walks, children's educational programs, art exhibits, concerts, lectures, workshops, and naturalist-led paddles (Discover the Adirondack Mountains at the VIC, 2017). Starting a management plan for an outdoor rock climbing wall, located on the VIC property, involves many aspects and considerations. These specifications must then be effectively evaluated to start a functioning program.
Access: Yes
Literary Rights: On
Major: Recreation, Adventure Education and Leisure Management
Year: 2017
File Attachments: Management Plan
Authors: Bayle Reichert, Brian Lane

Master Interpretive Plan for the Paul Smith's College VIC

Fri, 05/05/2017 - 23:49
Abstract: The Master Interpretive Plan is an elaborate document used to plan programs that utilize all aspects of the VIC to ensure the programs achieve the goals and mission. This particular document is a framework that is intended to be used by the VIC staff to develop a more in-depth working document.
Access: Yes
Literary Rights: Off
Major: Recreation, Adventure Education and Leisure Management
Year: 2017
File Attachments: final4-19 (1).docx
Authors: Alicia M. Feraldi, Christopher M. Harloff

Feasibility Study of Running a Summer Day Camp at the VIC

Mon, 05/08/2017 - 19:28
Abstract: Since the late nineteenth century, summer camp has been a part of the lives of American children; over the years it has transformed from a place for young boys to learn “manly things” to a place where parents can send their children for a summer of experience, education, and memories (Van Slyck, 2006). According to the American Camp Association, there are over 14,000 day and overnight camps in the US with approximately 14 million children and adults in the US attending camps annually. Recent research has shown the many benefits of sending children to summer camp, which includes physical, educational, and social benefits. The Paul Smith’s College VIC consists of 3,000 acres including 25 miles of trails for recreational use by the public and an interpretive center used for art shows and environmental education. Their mission is “to connect outdoor recreation, experiential education, and the arts, naturally.” Through the vast amount of land and use of the interpretive building, the VIC could potentially be the ideal location for a summer day camp. There are several other factors to consider in whether or not the VIC is a feasible location to run a day camp; these include products and services offered, the target market, marketing strategies, organization and staffing, annual scheduling,technological analysis, financial projections, and recommendations. The mission of this potential day camp is to connect children with nature, the environment and each other, fostering learning, environmental stewardship, and friendship. Through this study, it has been determined that a day camp is feasible - it would take some time however, to get funding, licensing, insurance, staff, etc. into place before the program could be implemented.
Access: Yes
Literary Rights: On
Major: Recreation, Adventure Education and Leisure Management
Year: 2017
Authors: Lenore Elizabeth Marcuson, Lauren Elsa Brieant